(Online Herald News — September 28, 2016) —

A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.

Access full report at http://www.fiormarkets.com/report/global-data-center-construction-market-by-manufacturers-regions-2819.html

Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.

Data center construction primarily focuses on designing and building a data center using these key factors:

Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.

Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.

Download sample report at http://www.fiormarkets.com/report-detail/2819/request-sample

Scope of the Report:

This report focuses on the Data Center Construction in Global market, especially in North America, Europe and Asia-Pacific, Latin America, Middle and Africa. This report categorizes the market based on manufacturers, regions, type and application.

Market Segment by Manufacturers, this report covers
AECOM
Arup Group
Corgan Associates
DPR Construction
Fluor
HDR Architecture
Holder Construction Group
ISG Construction
Jacobs Engineering Group
Jones Engineering
Nakano Corporation
Schneider Electric
SISK Group
Sweett Group
Turner Construction

Market Segment by Regions, regional analysis covers
North America (USA, Canada and Mexico)
Europe (Germany, France, UK, Russia and Italy)
Asia-Pacific (China, Japan, Korea, India and Southeast Asia)
Latin America, Middle and Africa

Market Segment by Type, covers
Electrical Construction
Mechanical Construction
General Construction

Market Segment by Applications, can be divided into
Finance
Internet

About  

Telecommunications
Government
Others